+1 (845) 317-8489 [email protected]

) Discuss the effects of batch size on the production system.

 

 

Discuss the reason simulation results of move batching and process batching are different.

 

 

 Why does move batching in a big production line have the long batch waiting time with high utilization than with low utilization?

 

 

) Explain the effects of batch size on the production system when processing time is fixed at  EXPO (30) for the process batching model.